Chapter 22 — Introduction to Flight Planning and Monitoring
A practical foundation in preparing, calculating, documenting and monitoring a flight. This chapter introduces the planning language, distance relationships and mass calculations used throughout the Flight Planning and Monitoring module.
Learning objectives
By the end of this chapter, a student should be able to explain the purpose of flight planning and monitoring, identify the main documents used to prepare a flight, distinguish nautical air miles from nautical ground miles, use the NAM/NGM relationships, explain the purpose of CAP 697 performance data, apply core mass definitions, calculate maximum take-off mass, maximum traffic load and maximum fuel at take-off, and perform common aviation unit conversions.
Purpose and scope of flight planning and monitoring
Flight planning is the organised process of determining how a flight is intended to be conducted and verifying that the proposed operation is feasible. It combines information about the aircraft, route, weather, aerodromes, fuel, mass, performance, airspace and operational restrictions.
Flight monitoring is the continuing review of the flight as it progresses. The actual flight may differ from the plan because of changing weather, winds, air traffic control instructions, route changes, holding, technical issues or a change in the destination's availability. Monitoring compares the actual situation with the planned situation and identifies when the crew or operations team needs to reassess the plan.
Why planning is more than drawing a route
The flight preparation workflow
A flight should be prepared in a logical sequence so that decisions made early are checked against later constraints. The exact company process varies, but a typical planning workflow includes the following stages.
Planning is iterative
These steps are not always a one-way checklist. For example, a route change may increase distance and trip fuel. The extra fuel increases take-off mass, which may reduce payload or require a performance reassessment. A destination weather change may require a different alternate, which can change the fuel requirement again.
Flight planning documentation
Flight planning depends on current, relevant and authoritative information. The planning package differs between operators and aircraft types, but commonly includes several groups of documents.
Operational Flight Plan (OFP)
The OFP is the operator's planning document for the conduct of a particular flight. Depending on the operator's system, it can include aircraft and flight identification, route and waypoint details, planned levels and speeds, estimated times, fuel figures, mass information, alternates, weather references and operational remarks. It is a planning and briefing document; its exact format and approval process are established by the operator.
Air Traffic Services (ATS) flight plan
The ATS flight plan communicates specified flight details to the air traffic services system. It includes information such as aircraft identification, flight rules/type, aircraft type and equipment, departure, route, destination, estimated elapsed time, alternate aerodromes and other required information. It serves an air traffic management purpose and is not a substitute for the operator's full operational flight plan.
Supporting information
| Information source | Why it is used | Typical planning questions |
|---|---|---|
| AIP and AIP amendments | State-published aeronautical information of a lasting or formally amended nature. | What are the published aerodrome, route, airspace, communication and navigation details? |
| NOTAM and AIP Supplements | Operationally significant changes, temporary conditions and hazards. | Is a runway, navaid, procedure or airspace segment unavailable or restricted? |
| Weather reports and forecasts | Assess departure, en-route, destination and alternate conditions. | Are conditions suitable, and what weather threats may affect the route? |
| Charts and navigation data | Support route construction and navigation cross-checks. | Are tracks, distances, fixes, airways and procedures correctly identified? |
| Aircraft manuals and performance data | Establish aircraft limitations, fuel/performance data and approved procedures. | Can the aircraft perform the planned operation under the expected conditions? |
| Mass and balance data | Verify loading and centre-of-gravity compliance. | Are take-off, zero-fuel and landing masses within limits? |
| Company Operations Manual and procedures | Apply the operator's approved policies and workflows. | What fuel, alternate, dispatch, briefing and monitoring procedures apply? |
Who contributes to the flight plan?
Flight planning is a coordinated activity. The exact division of responsibility depends on the State's regulations and the operator's approved method of operational control.
In some regulatory systems, operational control is shared between the PIC and dispatcher for specified operations. In other systems, responsibilities and approvals are defined differently. Students must not assume that one country's dispatch model applies universally.
Nautical Air Miles (NAM) and Nautical Ground Miles (NGM)
Flight planning calculations sometimes use a distance measured through the air mass and a distance measured over the ground. These are not always equal because wind affects the aircraft's groundspeed.
When there is no wind component along the route, TAS and groundspeed are equal, so NAM and NGM are equal. With a headwind, groundspeed is lower than TAS and the aircraft covers fewer ground miles than air miles in the same time. With a tailwind, groundspeed is higher than TAS and the aircraft covers more ground miles than air miles.
Why the distinction is useful
Aircraft performance tables may express climb or descent distance in NAM because the aircraft's performance is related to its motion through the air. A route or chart distance is normally a ground distance. Wind must therefore be accounted for when converting between the two.
NAM/NGM relationship when TAS is given
When TAS and groundspeed are known, the relationship between air distance and ground distance is:
Groundspeed is found by applying the along-track wind component to TAS. In the exercise convention used in this chapter, a tailwind component is positive and a headwind component is negative.
Worked example 1 — headwind
An aircraft has a TAS of 160 kt and a headwind component of 20 kt. It travels for 30 minutes. Calculate the groundspeed, NAM and NGM.
- Wind component = −20 kt.
- GS = 160 − 20 = 140 kt.
- Time = 30/60 = 0.5 hours.
- NAM = 160 × 0.5 = 80 NM.
- NGM = 80 × (140/160) = 70 NM.
Worked example 2 — tailwind
An aircraft has a TAS of 200 kt and a tailwind component of 30 kt. In 45 minutes, how many ground miles are covered if 150 NAM are flown?
- GS = 200 + 30 = 230 kt.
- NGM = 150 × (230/200).
- NGM = 172.5 NM.
Worked example 3 — calculate NAM from NGM
A flight segment is 120 NGM. TAS is 240 kt and the tailwind component is 20 kt.
- GS = 240 + 20 = 260 kt.
- Rearrange the relationship: NAM = NGM × TAS/GS.
- NAM = 120 × 240/260 = 110.77 NM.
NAM/NGM relationship when TAS is not given
Use the same sign convention: tailwind positive; headwind negative. The wind component is in knots and the time is in minutes.
Worked example 4 — climb into a headwind
An aircraft climbs for 15 minutes, covering 25 NAM. The wind component is −15 kt. Calculate NGM.
NGM = 25 − 3.75
NGM = 21.25 NM
Worked example 5 — climb with a tailwind
An aircraft climbs for 20 minutes, covering 40 NAM, with a tailwind component of +24 kt.
NGM = 40 + 8
NGM = 48 NM
Common calculation mistakes
- Using hours in a formula that expects minutes, or vice versa.
- Entering a headwind as a positive number when the convention requires a negative component.
- Confusing NAM with charted route distance.
- Applying the TAS-based formula when the question specifically requires the no-TAS climb/descent relationship.
- Failing to check whether the result is physically reasonable.
Introduction to CAP 697
The source describes four broad sections:
| Section | Aircraft/data group | Planning use |
|---|---|---|
| Section I | General notes | Definitions, conversion data and general planning information. |
| Section II | Single-engine piston aeroplane (SEP 1) | Planning data for the nominated single-engine piston aircraft. |
| Section III | Multi-engine piston aeroplane (MEP 1) | Planning data for the nominated multi-engine piston aircraft. |
| Section IV | Medium Range Jet Transport (MRJT) | Jet transport planning tables and procedures. |
For the historical examination context, the text notes that the MRJT section was not examined at CPL level. That statement belongs to the particular syllabus/examination context of the source and should not be treated as a current universal examination rule.
How to use performance tables responsibly
- Identify the correct aircraft type and table.
- Read the table heading, units, conditions and notes before extracting a value.
- Enter the table using the correct mass, altitude, temperature, wind or other stated variable.
- Interpolate only where the source method permits it and where the question requires it.
- Apply corrections and allowances in the order stated by the manual.
- Check that the result is consistent with the direction of the relevant variable.
Essential aircraft mass definitions
Flight planning requires a consistent understanding of what is included in each mass. Some masses include fuel; others deliberately exclude usable fuel. A misunderstanding can lead to an incorrect payload, fuel or take-off calculation.
| Term | Meaning |
|---|---|
| Basic Empty Mass (BEM) | Aircraft mass plus standard items such as unusable fuel and fluids, lubricating oil, fire extinguishers, emergency oxygen equipment and specified installed equipment. |
| Dry Operating Mass (DOM) | Aircraft ready for a specific operation, excluding usable fuel and traffic load. It includes the relevant crew, crew baggage, catering and other operational items specified by the operator's mass definition. |
| Operating Mass (OM) | DOM plus fuel, but without traffic load. |
| Traffic Load | Passengers, baggage and cargo, including applicable non-revenue load. |
| Zero Fuel Mass (ZFM) | DOM plus traffic load, excluding usable fuel. |
| Maximum Zero Fuel Mass (MZFM) | Maximum permitted aircraft mass with no usable fuel. |
| Taxi Mass | Aircraft mass at the start of taxi. |
| Maximum Structural Taxi Mass (MSTM) | Structural mass limit at commencement of taxi. |
| Take-Off Mass (TOM) | Total aircraft mass at the start of the take-off run. |
| Maximum Structural Take-Off Mass (MSTOM) | Maximum permissible total aircraft mass at the start of the take-off run. |
| Performance-Limited Take-Off Mass (PLTOM) | Maximum take-off mass allowed by departure performance limitations for the conditions assessed. |
| Regulated Take-Off Mass (RTOM) | The lower of the performance-limited take-off mass and the maximum structural take-off mass. |
| Performance-Limited Landing Mass (PLLM) | Maximum landing mass allowed by destination performance limitations for the conditions assessed. |
| Maximum Structural Landing Mass (MSLM) | Maximum structural mass permitted on landing under the applicable conditions. |
| Regulated Landing Mass (RLM) | The lower of the performance-limited landing mass and maximum structural landing mass. |
| Gross / All-Up Mass | Total aircraft mass at a particular point in the operation. |
| Useful / Disposable Load | Traffic load plus usable fuel on board, using the terminology of standard training material. |
Mass relationships to remember
OM = DOM + Fuel
Take-Off Mass = DOM + Traffic Load + Fuel at Take-Off
These equations are simplified teaching relationships. Actual operator mass statements may include additional defined items, and the approved mass-and-balance method must be followed.
Calculating maximum take-off mass
1. RTOM
2. RLM + Trip Fuel
3. MZFM + Fuel at Take-Off
First determine the regulated limits:
RLM = lower of PLLM and MSLM
Worked example 6 — three-column maximum take-off mass
Given:
- Maximum structural take-off mass: 78,000 kg
- Maximum structural landing mass: 71,500 kg
- Maximum zero fuel mass: 63,000 kg
- Maximum performance-limited take-off mass: 85,000 kg
- Maximum performance-limited landing mass: 67,000 kg
- Fuel at take-off: 13,800 kg
- Trip fuel: 5,200 kg
| Constraint | Calculation | Result |
|---|---|---|
| Take-off limit | RTOM | 78,000 kg |
| Landing limit | RLM + trip fuel = 67,000 + 5,200 | 72,200 kg |
| Zero-fuel limit | MZFM + take-off fuel = 63,000 + 13,800 | 76,800 kg |
= 72,200 kg
Why the lowest value controls
If the aircraft departed at 78,000 kg and burned 5,200 kg of trip fuel, its estimated arrival mass would be 72,800 kg. That exceeds the regulated landing mass of 67,000 kg. The aircraft would therefore violate the landing constraint even though it was at the structural take-off mass.
Calculating maximum traffic load
Once the maximum permitted take-off mass has been established, the maximum traffic load can be calculated by subtracting the DOM and the fuel carried at take-off.
Worked example 7 — maximum traffic load
Use the previous example. Maximum take-off mass is 72,200 kg. DOM is 35,600 kg and fuel at take-off is 13,800 kg.
= 22,800 kg
Operational interpretation
Traffic load includes passengers, baggage and cargo as defined by the operator. It is not necessarily the same as the number of passengers multiplied by an assumed average mass: the approved passenger and baggage mass policy, actual cargo figures and any special load items must be used.
If the available traffic load exceeds the calculated limit, the flight cannot simply accept the extra load. The operator must adjust the load, fuel or other planning elements and recalculate all affected constraints. Any change to fuel can alter take-off mass, landing mass and payload capacity.
Calculating maximum fuel at take-off
Where the traffic load is known and the objective is to determine the maximum fuel that can be carried, first determine the maximum take-off mass using the applicable take-off and landing constraints. The maximum zero-fuel-mass column cannot be evaluated using an unknown fuel quantity in the same way as a known-fuel take-off mass problem; use the method specified in the source and the aircraft/operator's actual loading rules.
Worked example 8 — maximum take-off fuel
Given:
- RTOM: 78,000 kg
- RLM: 67,000 kg
- Trip fuel: 5,200 kg
- DOM: 35,600 kg
- Traffic load: 15,500 kg
= 21,100 kg
What happens when fuel demand exceeds capacity?
If the required fuel exceeds the amount that can be carried with the planned traffic load and all mass constraints satisfied, the plan must be revised. Possible planning responses include reducing traffic load, reviewing the route or fuel assumptions, selecting a suitable alternate strategy where permitted, or changing the operation. Fuel must never be reduced below the required amount merely to make the mass calculation work.
Common aviation conversions
Flight planning data may use different units for mass, volume, distance and length. Incorrect conversion can create significant errors, so students should know the standard factors and keep units visible throughout calculations.
| Conversion | Factor |
|---|---|
| Pounds to kilograms | lb × 0.45359237 = kg |
| Kilograms to pounds | kg × 2.20462262 = lb |
| Imperial gallons to litres | Imp gal × 4.546092 = L |
| US gallons to litres | US gal × 3.785412 = L |
| Feet to metres | ft × 0.3048 = m |
| Nautical miles to metres | NM × 1,852 = m |
Worked example 9 — US gallons to litres
Convert 65 US gallons to litres.
Worked example 10 — nautical miles to metres
Convert 4.8 NM to metres.
Worked example 11 — pounds to kilograms
Convert 18,000 lb to kilograms.
Integrated planning examples
Scenario A — the route has changed
A dispatcher prepares a route using a planned ground distance of 420 NM. A revised clearance adds 35 NM. The aircraft's planned groundspeed is 210 kt. Estimate the additional flight time, assuming the groundspeed remains constant.
= 0.1667 hours
= 10 minutes
Scenario B — the take-off mass is not the controlling value
An aircraft has RTOM 60,000 kg, RLM 54,000 kg, trip fuel 4,500 kg, MZFM 45,000 kg and take-off fuel 12,000 kg.
Column 2 = RLM + trip fuel = 58,500 kg
Column 3 = MZFM + take-off fuel = 57,000 kg
Maximum TOM = 57,000 kg
Scenario C — monitoring identifies a fuel deviation
A flight departs with 8,000 kg of usable fuel. At a planned checkpoint, the OFP predicted 5,200 kg remaining, but the actual indicated remaining fuel is 4,850 kg.
= 4,850 − 5,200
= −350 kg
22.15 · Building the operational flight-planning package
A flight-planning package is not simply a route line and a fuel figure. It is a coordinated set of information that allows the operator and flight crew to understand the proposed flight, verify that it is permitted and feasible, and recognise what must be reassessed if conditions change.
1. Aircraft and operational status
Confirm the aircraft registration, type and variant, configuration, serviceability status, relevant deferred defects, equipment restrictions and any operational approval required for the route. A route that is suitable for one aircraft configuration may not be suitable for another. For example, an aircraft with an inoperative navigation or communication system may be subject to route, airspace or approach restrictions under the operator's approved procedures.
2. Route and airspace information
Identify the departure, destination, destination alternate and any en-route alternates or suitable diversion aerodromes required by the operation. Check route availability, airway restrictions, required navigation performance, crossing restrictions, minimum en-route altitudes, prohibited or restricted areas, and any applicable route charges or flow measures. Distinguish a route that is geographically possible from one that is operationally authorised.
3. Weather and aerodrome suitability
Review the forecast and observed weather for the departure, destination, alternate and significant route areas. Consider the validity period of each report, forecast changes, crosswinds, runway condition, visibility, cloud base, thunderstorms, icing, turbulence and wind at cruise levels. A weather report is time-sensitive: a briefing prepared too early may no longer represent the conditions expected at the time of operation.
4. Performance, mass and fuel
Use the aircraft's approved performance data and the operator's procedures to verify take-off, climb, en-route, approach and landing considerations. Confirm that the planned mass and centre of gravity remain within limits. Fuel planning must account for the planned route and the applicable reserve policy; a mass calculation that permits a certain fuel load does not prove that the fuel load is operationally sufficient.
5. Final review and release
Before departure, ensure that significant changes have been incorporated: revised weather, runway changes, aircraft substitutions, load changes, ATC reroutes, delays and updated fuel figures. The exact release and authorisation process depends on the State rules and the operator's approved operations manual.
22.17 · Weather information as a planning input
Weather is not an item to review once and then forget. It affects route selection, altitude, groundspeed, fuel consumption, runway suitability, alternate selection and the likelihood of delay or diversion. The planner should identify both the forecast conditions and the uncertainty or change expected during the period of operation.
Information to consider
An aircraft has a TAS of 180 kt and encounters a 25 kt headwind component. For a simplified level-flight example, GS = 180 − 25 = 155 kt. For a 310 NM ground leg, time = 310 ÷ 155 = 2 hours. With zero wind, the same distance at 180 kt would take about 1 hour 43 minutes. The headwind therefore adds approximately 17 minutes in this simplified comparison.
22.18 · Flight monitoring: comparing plan with reality
Flight monitoring is the continuing assessment of the flight against the operational plan. It helps identify deviations early enough for the crew and operations team to assess their significance and take appropriate action under the applicable procedures.
Typical items monitored
- Actual departure, waypoint and arrival times compared with estimates.
- Actual route and level compared with the planned route and cleared profile.
- Fuel remaining compared with planned fuel remaining at suitable checkpoints.
- Weather changes at destination, alternates and along the route.
- ATC restrictions, holding, rerouting, airport closures and runway changes.
- Aircraft technical reports and operational limitations that arise during flight.
At a reporting point, the plan predicts 6,400 kg remaining. The crew reports 6,050 kg.
Fuel deviation = Actual − Planned = 6,050 − 6,400 = −350 kg.
The aircraft has 350 kg less fuel than planned at that point. The figure is a trigger for assessment, not a complete decision by itself. The crew must assess the cause, projected fuel at destination, remaining route, weather, delays, alternate and required reserves using approved procedures.
Deviation is information, not automatically a decision
A difference between actual and planned values should be interpreted in context. A time deviation may result from a tailwind, shortcut or ATC vector. A fuel deviation may result from a different speed, level, routing, anti-ice use or an inaccurate assumption. Identify the reason where possible, recalculate the projected outcome and communicate relevant information clearly.
Operational monitoring does not replace the pilot-in-command's authority or the requirements of ATC. It provides timely information and support so that decisions can be made using the correct operational picture.
22.19 · Mass limits: interpreting the controlling constraint
The method in this chapter compares the applicable take-off, landing and zero-fuel constraints. The lowest calculated permitted take-off mass controls because the aircraft must satisfy all relevant limits, not just one of them.
Mass build-up
These relationships explain why the same aircraft can be limited by different constraints on different flights. A heavy traffic load may make the MZFM controlling; a long trip may make the landing-mass limit controlling; high temperature, runway or obstacle conditions may reduce the performance-limited take-off mass.
RTOM = 58,000 kg; RLM = 52,000 kg; trip fuel = 4,000 kg; MZFM = 46,500 kg; take-off fuel = 10,000 kg.
Column 1: RTOM = 58,000 kg.
Column 2: RLM + trip fuel = 52,000 + 4,000 = 56,000 kg.
Column 3: MZFM + take-off fuel = 46,500 + 10,000 = 56,500 kg.
The lowest result is 56,000 kg; the landing-mass constraint controls.
Mass is not the same as centre of gravity
A flight can be below every mass limit and still be unacceptable if the centre of gravity is outside the approved envelope. The distribution of passengers, baggage, cargo and fuel matters as well as the total mass. This chapter introduces mass calculations; detailed loading, moments and centre-of-gravity envelope work must be completed using the applicable approved mass-and-balance method and aircraft data.
22.20 · Common flight-planning errors and quality checks
| Common error | Why it matters | Good planning check |
|---|---|---|
| Using stale weather | Conditions may have changed before departure or arrival. | Check issue time, validity period and amendments. |
| Confusing air distance and ground distance | Time and distance calculations may be wrong. | Label NAM, NGM and route distance clearly. |
| Incorrect wind sign | Headwind and tailwind effects are reversed. | Write the sign convention before calculating. |
| Mixing mass limits | A non-controlling limit may be selected. | Calculate each applicable column and select the lowest. |
| Forgetting changes after a reroute | Time, fuel and downstream estimates may be obsolete. | Recalculate affected legs and dependent values. |
| Treating a fuel deviation as a complete answer | The reason and projected landing fuel still need assessment. | Reassess remaining route, destination, alternate and reserves. |
| Using generic data instead of aircraft/operator data | Actual limitations and procedures may differ. | Use current approved manuals and operator procedures. |
Chapter summary and key learning points
- Flight planning establishes the intended route, aircraft suitability, fuel, mass, performance and operational arrangements.
- Flight monitoring compares actual flight progress and conditions with the plan and prompts reassessment when required.
- The OFP and ATS flight plan serve different purposes; neither should be confused with the other.
- Operational planning uses current aeronautical, meteorological, aircraft and company information.
- NAM is distance through the air at TAS; NGM is distance over the ground at groundspeed.
- With a headwind, NGM is less than NAM; with a tailwind, NGM is greater than NAM.
- When TAS is given: NGM = NAM × GS/TAS.
- When TAS is not given in the relevant climb/descent exercise: NGM = NAM + (time × wind component)/60.
- RTOM is the lower of performance-limited and structural take-off mass.
- RLM is the lower of performance-limited and structural landing mass.
- Maximum TOM is the lowest of RTOM, RLM + trip fuel, and MZFM + take-off fuel.
- Maximum traffic load = maximum TOM − DOM − take-off fuel.
- Maximum take-off fuel = maximum TOM − DOM − traffic load.
- Conversions must use the correct unit and conversion factor.
Chapter 22 — 20 multiple-choice questions
Further study
Educational material for theoretical study. Historical terms, manual layouts and example methods are preserved where relevant to standard training material. For real operations, use current State regulations, approved aircraft documentation, operator manuals and approved flight-planning systems.