AEROLEARN RWANDA/Flight Planning & Performance/Chapter 30
Flight Planning & Monitoring · Module 3

MRJT Additional Procedures

ETOPS/EDTO, critical fuel, diversion planning, non-normal operations, fuel tankering and computer-generated flight plans.

66Learning sections
9Images & diagrams
70Interactive MCQs

Important training limitation

Training material only. The CAP 697 MRJT1 and Worked examples are generic licensing-study material. They are not approved aircraft performance data, an operator's ETOPS approval, or a substitute for current regulations, the AFM/FCOM, Operations Specifications, MEL or Operations Manual. Real dispatch must use current approved data and procedures.

1. Learning objectives

By the end of this chapter, you should be able to explain the purpose and planning logic of Extended Twin Operations (ETOPS), distinguish adequate from suitable aerodromes, identify dispatch constraints, describe pre-flight and in-flight fuel policy, explain critical fuel and the most critical point, interpret diversion-distance and one-engine-inoperative diversion data, assess non-normal operations and fuel tankering, and independently audit a computer-generated operational flight plan (OFP).

2. Where this chapter fits

Chapter 29 developed detailed MRJT climb, cruise and descent calculations. This chapter moves from normal route fuel calculations to additional procedures that protect the flight when a remote-area operation or an abnormal event changes the plan. Its major themes are ETOPS, diversion planning, non-normal operations, fuel tankering and computer flight plans.

3. Why extended-range planning exists

A twin-engine transport aircraft may spend part of a route far from airports. A technical event can require the aircraft to divert, potentially with one engine inoperative, loss of pressurisation, or a combination of failures. ETOPS/EDTO planning establishes whether the aircraft, operator, route, alternates, crew, maintenance arrangements and fuel plan are approved and capable of supporting that operation. It is not simply a line drawn on a map: it is an integrated operational approval and safety system.

4. ETOPS terminology and regulatory caution

ETOPS is the historical and widely used term for extended-range twin-engine operations; EDTO is used in ICAO material for extended diversion time operations. The chapter uses ETOPS terminology and a particular historical training framework. Actual approvals, threshold times, terminology, fuel scenarios and dispatch requirements depend on the State, operator approval, aircraft/engine combination and current Operations Specifications/Operations Manual. Never treat a training example or a generic time such as 120 or 180 minutes as an automatic approval for a real aircraft.

5. Threshold distance, rule time and rule distance

The text defines threshold distance as the still-air distance covered in 60 minutes at the normal one-engine-inoperative (OEI) cruise speed. Rule time is the maximum time any point on the route may be from a suitable aerodrome, as specified by the Authority and included in the Operations Manual. Rule distance is the distance travelled in that rule time at the normal OEI cruise speed. These are related but not interchangeable: time is the controlling concept, while distance is calculated using an approved speed and specified assumptions.

6. Adequate and suitable aerodromes

An **adequate aerodrome** is assessed for physical and service capability: runway length and condition, lighting, communications, ATC, weather reporting, navigation aids, rescue and safety arrangements, and an available instrument let-down/approach aid. A **suitable aerodrome** is an adequate aerodrome that is also suitable for the particular flight at the anticipated time of use. Suitability considers forecast weather against applicable planning minima, runway and approach availability, NOTAMs, aircraft performance, crosswind limits, services and any relevant unserviceability. The distinction is operational: an airport can be adequate in general but unsuitable for a particular diversion.

7. En-route alternate assessment

For each nominated en-route alternate, examine the forecast and reports over the required planning window, not just the weather at the moment the flight is dispatched. The material describes conditions from anticipated landing until one hour after the latest possible landing time being at or above planning minima. In current operations, apply the exact current State and operator rule. Also assess runway availability, approach type, lighting, rescue/fire-fighting category where required, operating hours, handling and fuel availability, terrain, and the expected aircraft landing mass.

8. ETOPS area of operation

DepartureAlternate AAlternate BDestinationIllustrative route geometry — not an approval chart
ETOPS route coverage: the route must remain within the approved diversion-time envelope to suitable alternates.
The area of operation is the region within which the operator is authorized to conduct the operation. Under the /CAP 697 training method, the diversion distance from any point along the route must remain within the approved diversion time using the approved OEI cruise speed in still-air, ISA conditions. This establishes the authorized geographical envelope; it does not replace the separate fuel calculation using forecast winds and temperatures. A route can satisfy the time envelope yet still require additional fuel for its critical scenario.

9. ETOPS entry, exit and route coverage

The ETOPS entry point is where the aircraft begins the portion of the route that is beyond the applicable threshold from an adequate aerodrome. The exit point is where it returns within the threshold. Between them, the route must be supported by nominated en-route alternates and the operator's approved procedures. Plot the route and diversion coverage using approved OEI speeds and the authorized diversion time. A route should be re-evaluated if a waypoint, track, alternate, forecast or aircraft configuration changes.

10. ETOPS planning: the dispatch gate

Before release, confirm that the particular aircraft/engine combination and operator hold the required approval; the aircraft is in the required configuration and maintenance status; the MEL permits the operation; communications and navigation coverage are adequate; suitable en-route alternates are available; required performance data and procedures are available; and both normal and ETOPS fuel calculations are satisfactory. The dispatcher and commander must use the operator's approved responsibilities and release process.

11. Minimum Equipment List (MEL)

The MEL reflects the minimum equipment and system redundancy needed for the approved operation. The chapter lists examples of primary systems that can matter to ETOPS: electrical/battery, hydraulic, pneumatic, flight instrumentation, fuel, flight controls, ice protection, engine start and ignition, propulsion instruments, navigation, communications, APU, air conditioning and pressurisation, cargo fire suppression, emergency equipment, and engine fire detection/extinguishing. A defect that might be acceptable for a non-ETOPS sector can restrict or prohibit an ETOPS dispatch. Always use the current aircraft-specific MEL and any ETOPS-specific provisos.

12. Communications and navigation facilities

The aircraft must have reliable two-way communication with the appropriate ATS units under expected propagation conditions at the planned OEI cruise altitudes, both along the route and on diversion routes. Navigation facilities and installed aircraft equipment must support the required navigation accuracy over the route and to alternates. The specified alternates must have the approved visual/non-visual aids needed for the authorized approach types and minima. Check actual coverage, NOTAMs, serviceability and any required redundancy; do not assume that nominal equipment fit guarantees route-wide availability.

13. Pre-flight fuel policy: the basic structure

The chapter lists taxi fuel, trip fuel, reserve fuel (contingency, destination alternate when required, final reserve), additional fuel required by the operation (for example ETOPS), and extra fuel if required by the commander. These categories serve different purposes. Do not merge them into one vague “reserve” figure: each must be calculated and identified according to the operator's approved fuel policy. The chapter's turbine final-reserve example is 30 minutes at holding speed at 1,500 ft above aerodrome elevation in standard conditions; current applicable regulations and operator policy must be checked before operational use.

14. In-flight fuel policy and replanning

When a flight must proceed along a route or to a destination other than originally planned, the in-flight calculation must account for trip fuel for the remainder, contingency, destination alternate fuel if required, final reserve, any operation-specific additional fuel and commander-requested extra fuel. Replanning is not merely “fuel remaining minus distance.” Recalculate the route, winds, expected level, aircraft mass, destination/alternate suitability, approach and landing requirements, and all protected reserves. Compare the revised requirement with usable fuel on board.

15. What is critical fuel?

Critical fuel is the fuel needed from the most critical point/ETP to reach a suitable diversion aerodrome following the defined critical failure scenario, including the required descent, cruise, approach and landing elements. The planned fuel on board at that point is compared with the critical fuel requirement. If planned fuel is lower, the difference must be addressed by additional fuel or by revising the plan within the operator's approved procedures. The most demanding scenario is not necessarily the longest distance: wind, aircraft mass, altitude, configuration and fuel flow all matter.

16. Critical failure scenarios in the method

The chapter compares three cases: (1) simultaneous engine and pressurisation failure — described as the worst scenario, with emergency descent to FL100 at VMO/MMO with speed brakes extended, then LRC diversion; (2) total pressurisation failure without engine failure, with emergency descent to FL100 and LRC cruise; and (3) engine failure without pressurisation failure, using the selected descent and stabilizing-level speeds. The greatest fuel requirement among the all-engine and single-engine cases is used in the training method. Real approved scenarios and assumptions must come from the current operator programme and regulatory framework.

17. The most critical point (CP) and equal time point (ETP)

An ETP is a position on the route where the time to two selected diversion aerodromes is equal under the specified conditions. The most critical point is the point that produces the most demanding fuel requirement when the relevant diversion possibilities and scenarios are compared. It may coincide with an ETP, but “equal time” and “critical fuel” describe different questions: ETP asks where diversion times are equal; critical-point analysis asks where the fuel protection requirement is greatest.

18. Finding an ETP: the basic method

ABETP495 NM405 NMSimplified example: wind changes the equal-time location
In the teaching example, the ETP is 495 NM from A rather than the 450 NM midpoint.
Identify the two candidate aerodromes and the route segment between them. Determine the aircraft's approved diversion speed and the forecast wind component at the relevant diversion level. Calculate the time from each candidate airport to points along the route, accounting for headwind or tailwind. The ETP is where the two diversion times are equal. With a wind, the ETP is generally not halfway by distance. Use the operator's approved method/software and verify the result independently when required.

19. Worked ETP construction example

The example gives an OEI cruise TAS of 400 kt and a still-air distance of 690 NM from the critical-line intersection on the route to either of two aerodromes. Still-air time is 690 ÷ 400 × 60 = 103.5 minutes, rounded in the source to 104 minutes. A mean wind of 85 kt produces a wind-vector distance of 85 × 104 ÷ 60 = 147.3 NM, approximately 147 NM. The source then back-plots a 147 NM wind vector in the stated 230° direction and draws an equal line parallel to the critical line; its intersection with the route identifies the most limiting ETP/CP. This is a chart-construction example, not a universal ETP formula.

20. ETP calculation: a simple numerical illustration

For a simplified straight route, let A–B be 900 NM, OEI TAS 300 kt, and a constant 30 kt headwind when diverting from the aircraft toward B (and therefore a 30 kt tailwind toward A, under the simplified reciprocal assumption). The groundspeeds are 270 kt toward B and 330 kt toward A. At an ETP, x/330 = (900−x)/270. Solving gives x = 495 NM from A. Notice that the ETP is not the 450 NM midpoint. This simplified example assumes a uniform wind and symmetric route geometry; real planning must use actual forecast vectors, tracks, levels and the approved ETP method.

21. Critical fuel comparison: dispatcher workflow

At each relevant CP/ETP: determine forecast fuel on board from the planned trip and expected burn; calculate critical fuel to each suitable alternate for each required failure scenario; include the applicable temperature, wind, icing, APU and approach/holding corrections; identify the greatest requirement; compare it with planned fuel at the point; and calculate any shortfall. If the fuel is insufficient, add fuel subject to mass/performance limits or revise the route/alternates/operation through approved procedures. Record assumptions and retain a traceable calculation.

22. CAP 697 MRJT1 critical-fuel graphs

The chapter refers to CAP 697 MRJT1 Figures 4.7.1a and 4.7.1b for LRC critical-fuel reserves, respectively for OEI and all-engines-operating cases. The training graphs use common assumptions including pressurisation failure, emergency descent to 10,000 ft, level cruise at 10,000 ft, descent at 250 KIAS to 1,500 ft above the airfield, a 15-minute hold, one missed approach, approach and landing, and a 5% allowance for wind errors. The OEI graph also includes APU fuel burn. The source notes corrections for temperatures hotter than ISA and icing. Use the graph's own notes carefully; do not substitute generic arithmetic for chart data.

23. Reading critical-fuel charts correctly

First identify whether the scenario is OEI or all-engines-operating. Confirm aircraft mass, diversion distance, cruise mode, forecast wind, temperature deviation and icing status. Enter the correct chart and read the base fuel value, then apply only the corrections explicitly specified by that chart. Check units and whether the value represents total scenario fuel or an increment. Finally compare the result with forecast fuel on board at the CP. A common error is selecting the all-engine graph for an engine-failure case or forgetting that the OEI graph's assumptions may include APU operation.

24. Area-of-operation diversion-distance chart

The chapter's CAP 697 Figure 4.7.2 method is to enter the chart with the appropriate diversion speed and aircraft weight at the diversion point, select the approved diversion time, and read the maximum diversion distance. This chart establishes a still-air/ISA operational envelope; it is not a forecast-wind fuel calculation. If the aircraft weight or speed changes materially along the route, use the appropriate value at the relevant point and follow the chart instructions for interpolation.

25. In-flight OEI LRC diversion

The chapter's CAP 697 Figure 4.7.3 provides a method to estimate fuel and time from a diversion point to an alternate for one engine inoperative without pressurisation failure, with drift-down to the selected stabilizing level. The chart requires the specified aircraft mass, diversion distance, wind component, cruise level and ISA deviation. Do not use this graph for a simultaneous engine/pressurisation failure scenario unless the approved chart explicitly supports that case.

26. Worked diversion example from the chapter

The example gives a 940 NM OEI LRC diversion at 60,000 kg, 50 kt headwind, FL260 and ISA deviation +20°C. The source answer is **7,300 kg** and **2.95 hours (2 h 57 min)**. This result is extracted from the referenced CAP 697 chart, not derived from a simple constant fuel-flow assumption. Use it to practise selecting the correct chart inputs and checking that a headwind and warmer-than-ISA condition are not ignored.

27. Non-normal operations: why the plan changes

A non-normal event can change the aircraft's performance, fuel flow, usable equipment, route, level or destination. Examples include engine failure, pressurisation failure, system malfunction, icing, turbulence, medical diversion, runway closure or a destination becoming unsuitable. The flight crew and dispatcher must follow the approved decision-making and communication procedures. The flight plan is a decision-support document, not permission to continue when safety or regulatory requirements are no longer met.

28. Diversion decision factors

A diversion decision should consider aircraft controllability and performance, remaining fuel and protected reserves, weather at candidate airports, runway and approach suitability, terrain and minimum safe altitudes, aircraft mass, system status, passenger/medical needs, rescue/fire-fighting services, airport operating hours, ATC constraints and the time to land. “Nearest” may mean nearest in time, distance, operational suitability or risk; the best choice is the suitable option under the circumstances and approved procedures.

29. Fuel tankering: definition and purpose

Fuel tankering means carrying more fuel than is required for the immediate sector so that some of it can be used on a later sector, often to avoid buying fuel at a more expensive destination. It can reduce the amount purchased at a high-price station, but the extra fuel has mass and therefore increases fuel burn during the sector on which it is carried. Tankering is an economic decision constrained by safety, aircraft performance, fuel quality, uplift capability, mass limits, and company policy.

30. Tankering economics: the core trade-off

The benefit is the price difference between fuel purchased at the destination and fuel carried from the origin. The cost is the additional fuel burned to transport the extra fuel mass, plus any associated operational or environmental costs. A simplified comparison is: **net saving = avoided destination purchase cost − origin purchase cost of tankered fuel − extra burn cost − other applicable costs**. The exact calculation must account for the aircraft-specific tankering factor, sector distance, mass profile, fuel prices, taxes, uplift constraints and the operator's cost model.

31. Worked tankering illustration

Assume the aircraft would otherwise buy 2,000 kg at the destination for $1.10/kg. The origin price is $0.80/kg. Suppose carrying the extra 2,000 kg causes an additional 120 kg of fuel to be burned on the first sector. Ignoring other costs, avoided destination purchase cost is $2,200; origin purchase cost is $1,600; the 120 kg burn costs $96 at the origin price. Simplified net saving = $2,200 − $1,600 − $96 = **$504**. This is an illustrative calculation only; an operator's model must use the actual burn penalty and all relevant charges.

32. Tankering limitations and risks

Before tankering, verify ramp, take-off, en-route and landing mass limits; structural fuel capacity; centre-of-gravity limits; runway and climb performance; fuel density/temperature and usable capacity; fuel quality and contamination controls; fuel supplier reliability; airport uplift limits; and any effect on payload. Carrying extra fuel may increase emissions and may be uneconomic if the burn penalty, price spread or extra handling cost is too high. Never tanker beyond approved limits or use economic assumptions to override required reserves.

33. Computer flight plans: what the system contains

The chapter describes computer flight-planning databases containing navigation beacon, waypoint and aerodrome coordinates; meteorological data; standard airline routes; ATC routes, airways, SIDs, STARs and published tracks; operator fuel-management policy; aircraft structural limits and performance; aerodrome dimensions and weather for regulated performance calculations; preferred alternates; fuel-costing policy; and preferred operating methods such as LRC, high-speed cruise, cruise climb or constant Mach. The quality of the output depends on the quality and currency of these inputs.

34. Minimum information for a computer plan

The source gives examples of basic inputs such as aircraft type, departure and destination, cruise mode, block time and required traffic load. Depending on the system and operation, additional inputs can include date/time, route constraints, runway, payload or mass, cost index, alternate, fuel policy, aircraft registration/configuration, MEL restrictions, weather package and special approvals. Confirm that the correct aircraft tail/configuration and operational constraints have been selected.

35. Garbage in, garbage out

A flight-planning computer can produce a neat, precise-looking document from incorrect inputs. A wrong aircraft variant, stale weather, wrong runway, incorrect route, missing NOTAM, wrong cost index, incorrect fuel policy or outdated performance database can invalidate the result. Automation reduces repetitive calculation; it does not remove the need for professional judgement and independent checking.

36. Reading the computer flight plan fuel summary

A typical summary may show destination/point-of-arrival fuel and time, alternate fuel and time, holding, contingency, required fuel, extra fuel, total fuel, take-off mass and landing mass. Read each label according to the operator's format. In the sample, POA is point of arrival; ALT is alternate; HLD is holding; CON is contingency; REQ is required fuel; XTR is extra fuel; TOT is total fuel. Do not assume every airline uses identical abbreviations or line order.

37. Reading route and navigation detail

The route section may show airway and waypoint identifiers, magnetic track, drift, leg distance, elapsed time, ETA/ATA, cumulative time, forecast wind, wind component, groundspeed, distance remaining, fuel remaining, minimum safe altitude and navigation-aid frequency. These fields allow the crew and dispatcher to check not only the total but also the plausibility of individual legs. Verify the route sequence and coordinates against the clearance and current navigation data.

38. Reading the ATC flight plan output

The example includes a computer-generated ICAO flight-plan representation. The filed ATS flight plan and the operational flight plan serve different but related purposes. Cross-check aircraft identification, type, wake category, equipment/surveillance capability, departure time, cruising speed and level, route, destination, EET, alternate, and other required information. The correct format and codes depend on the current ICAO flight-plan provisions and State requirements; use the current filing guidance rather than memorizing an old sample as universal.

39. Computer flight plan accuracy checks

The chapter explicitly warns not to assume a computer plan is invariably correct. Check that it is up to date and uses the latest forecasts; fuel and time are sensible for the season; tracks and distances are reasonable; wind velocities and average wind components agree with the meteorological forecast; alternates are acceptable; and the cruise method is appropriate. For a new or rarely flown route, cross-check against approved simplified planning data or agreed operator rules of thumb.

40. Independent cross-checks and reasonableness

Compare route distance with expected groundspeed and elapsed time. Check that fuel burn is consistent with aircraft type, mass, level, temperature and cruise mode. Compare alternate fuel with distance, wind and diversion profile. Review the planned landing mass and reserves. Confirm the weather package timestamp, NOTAM validity, runway, route and aircraft configuration. Look for discontinuities in groundspeed, implausible fuel remaining, impossible climb/descent profiles, missing waypoints and inconsistent ETAs.

41. Dispatcher–crew coordination

A robust plan is shared understanding, not just a dispatcher's spreadsheet. Highlight operationally significant assumptions: en-route alternates, ETP/CP locations, critical fuel, MEL restrictions, weather minima, route constraints, fuel increments and contingency triggers. When conditions change, communicate the updated facts, options and consequences clearly. The commander retains command authority; dispatch responsibilities and joint decision-making are defined by the operator's approved system.

42. Case study: alternate becomes unsuitable

A twin-engine flight is planned across a remote sector with two nominated en-route alternates. Before departure, a new forecast places one alternate below the applicable planning minima during the required window. The dispatcher should not simply keep the route because the airport is geographically close. Reassess the remaining suitable alternates, route coverage, diversion times, ETP/critical-point analysis and fuel. If the approved operation can no longer be supported, revise the route or delay/cancel in accordance with the operator's procedures.

43. Case study: computer plan has a wind error

The OFP predicts a 40 kt tailwind and a relatively short EET. The latest forecast indicates a 20 kt headwind. The dispatcher should identify the affected legs, recompute groundspeed, time, fuel and arrival fuel, and re-evaluate any ETP/critical-fuel values that depend on the wind. A change in wind may shift the ETP and increase diversion fuel. Do not adjust only the destination ETA while leaving the critical fuel analysis unchanged.

44. Case study: fuel shortfall at the critical point

A plan predicts 8,900 kg on board at the most critical point, while the approved critical-fuel analysis requires 9,250 kg. The shortfall is 350 kg. The correct response is not to hide the difference inside contingency or assume it will not happen. Determine whether additional fuel can be carried within all mass/performance limits, whether a different suitable alternate or route changes the requirement, or whether the operation must be replanned. Record the approved solution and re-run the checks.

45. Case study: evaluating a tankering proposal

An origin station offers cheaper fuel, but the aircraft is already close to a take-off mass limit on a hot day. The dispatcher compares the net price benefit with extra fuel burn and checks take-off performance, climb gradient, runway condition, landing mass, tank capacity, fuel temperature/density and payload impact. If the uplift would exceed a mass limit or compromise required performance, the economic benefit is irrelevant: the tankering proposal must be reduced or rejected.

50. ETOPS route geometry: coverage is a time problem, not simply a distance problem

ETOPS route analysis asks whether every point on the planned route remains within the approved diversion time of at least one adequate aerodrome, using the approved one-engine-inoperative (OEI) speed and the applicable still-air/standard assumptions for the approval test. The route is not assessed by drawing a simple circle around an airport and measuring straight-line distance alone: route geometry, approved speed, time limit, airport status and the operator's approval all matter.

DepartureETOPS entryETP / CP*ETOPS exitDestination*Schematic only: the ETP and fuel-critical point may differ.
Conceptual route sequence. Actual entry/exit points and diversion coverage are calculated from approved data.

Practical interpretation

    Dispatcher's check: Use the approved diversion speed and maximum diversion time for the particular aircraft/engine combination and route. Do not assume every twin has the same approval or that a familiar 60/120/180-minute label is universal.

    51. Alternate availability: the airport must work at the time you may need it

    Boeing provides an ETOPS/EROPS en-route alternate overview. Open Boeing ETOPS/EROPS reference PDF

    An airport can be geographically close yet unsuitable for the planned diversion. Adequacy is the baseline capability assessment; suitability is the operation-specific decision considering forecast weather, runway condition, approach capability, services, NOTAMs, aircraft status, terrain and the expected time of arrival.

    Build an alternate assessment window

    1. Calculate the earliest plausible arrival time at the alternate.
    2. Calculate the latest plausible arrival time, allowing for the approved planning assumptions and diversion scenario.
    3. Review weather for the full period required by the applicable rule and company procedure.
    4. Review NOTAMs and service status for runway, lighting, approach aids, rescue/firefighting, fuel and communications.
    5. Check whether the aircraft in its expected abnormal configuration can safely use the runway and approach.
    6. Record the source, issue time and validity of each item checked.
    Do not mix jurisdictions: the chapter reflects its own historical regulatory framing. Apply the current State of Operator requirements and approved Operations Specifications in actual dispatch.

    52. MEL impact: why an apparently minor defect can change ETOPS eligibility

    The Minimum Equipment List is not simply a list of items that may be inoperative. It includes conditions, limitations, procedures and sometimes operational restrictions. ETOPS-relevant systems can include electrical generation, hydraulics, pneumatics, fuel, flight instruments, flight controls, ice protection, engine start/ignition, navigation, communications, APU, pressurisation/air conditioning and fire protection.

    System / itemWhy it matters to the diversion planDispatcher's verification
    Electrical generationCan affect redundancy and essential services after an engine shutdownApplicable MEL item, ETOPS provisos and dispatch configuration
    CommunicationsMay compromise required two-way contact with ATC or alternatesRequired independent systems and route coverage
    NavigationCan reduce navigation capability on remote routes and diversion pathsRequired equipment, serviceability and approved route capability
    APUMay be required by the approved configuration or critical-fuel assumptionsAircraft-specific MEL and ETOPS dispatch requirements
    Ice protectionCan change dispatch restrictions and fuel/performance assumptionsForecast icing, system status and applicable procedures
    Fire suppressionMay affect maximum diversion time due to system endurance limitsApproved time limitation and operator procedure

    53. Critical fuel: compare the most demanding failure case, not just the shortest route

    The chapter explains that critical fuel is evaluated from the critical point for defined failure scenarios. The most demanding fuel requirement is selected from the all-engines and single-engine cases specified by the training method. The exercise includes the consequences of engine failure, pressurisation failure, or both, and the aircraft configuration and profile prescribed by the relevant chart.

    Case A — engine + pressurisation failure

    One engine is shut down and the aircraft must descend to a lower altitude. The OEI cruise and APU assumptions in the chart may apply. This can be the most fuel-demanding case.

    Case B — pressurisation failure only

    Both engines remain operating, but the aircraft descends to the prescribed altitude and continues under the all-engines profile.

    Case C — engine failure only

    The aircraft drifts down or descends to the selected OEI stabilising altitude, then diverts using the prescribed speed schedule.

    Case D — planned route

    Compare the fuel expected to remain at the critical point with the fuel required by the critical scenario.

    the course's CAP 697 training graphs share assumptions including emergency descent to 10,000 ft, cruise at 10,000 ft, descent at 250 KIAS to 1,500 ft above the aerodrome, a 15-minute hold, one missed approach, approach and landing, and a 5% wind-error allowance. The OEI graph additionally includes APU fuel. These are chart assumptions, not universal operational profiles.

    Fuel margin at CP = Planned usable fuel at CP − Critical fuel required

    A positive margin indicates the planned quantity exceeds the chart requirement; a negative result identifies a shortfall that must be resolved using the operator's approved method before dispatch. Never round a marginal shortfall away.

    54. Worked critical-fuel examples: apply the Answer method

    The source exercises use CAP 697 MRJT1 critical-fuel graphs. The graph readings are not reproduced here as exact values because they must be taken from the relevant chart at its printed scale. The Answer key supplies the completed corrections below; use these to check your chart-reading process.

    exerciseChart reading / correctionFinal training answer
    Example 1: 48,000 kg, engine + pressurisation failure, FL100 +5°C, 50 kt headwind, 850 NM8,100 kg × 1.0058,140 kg
    Example 2: same conditions, pressurisation failure only8,600 kg × 1.0058,643 kg
    Example 3: 50,000 kg, engine + pressurisation failure, icing, FL100 −15°C, 60 kt tailwind, 750 NM5,500 kg × 1.206,600 kg
    Example 4: same conditions, pressurisation failure only5,800 kg × 1.186,844 kg

    Example calculation: Example 1

    1. Read the base critical-fuel quantity from the correct OEI graph for the given diversion distance and weight: 8,100 kg.
    2. Apply the chart correction of 0.5%: 8,100 × 1.005 = 8,140.5 kg.
    3. Compare this with planned usable fuel at the CP; if planned fuel is lower, the shortfall must be addressed.
    The chart correction percentages above are taken from the Answer key. Do not transfer them to another aircraft, chart revision or real dispatch calculation.

    55. ETP and critical point: related concepts, different questions

    Because time and fuel are not the same metric, the ETP and fuel-critical point do not automatically coincide. Wind, aircraft mass, altitude, engine status, pressurisation status, APU use and the selected alternates can change the fuel-critical location.

    Simple two-alternate time example

    Assume a route point has 690 NM to each of two alternates and the approved OEI TAS is 400 kt in still air. Still-air time to either is:

    690 ÷ 400 × 60 = 103.5 min ≈ 104 min

    With a 85 kt wind component affecting one diversion direction, the wind displacement over 104 minutes is 85 × 104 ÷ 60 ≈ 147 NM. The construction method plots this wind vector from the geometric critical-line intersection and draws a parallel equal-time line to locate the wind-corrected ETP. Use vector direction correctly: a wind that helps one diversion generally penalises the opposite direction.

    56. Diversion chart reading: speed, altitude, mass and temperature all matter

    The CAP 697 Figure 4.7.3 method in the text estimates fuel and time for an OEI LRC diversion with no pressurisation failure. The aircraft drifts down to the selected cruise level. It is not the same chart as the critical-fuel graph for combined engine and pressurisation failure.

    Example 6 — full method and answer

    • OEI LRC diversion distance: 940 NM
    • Weight at diversion point: 60,000 kg
    • Wind component: 50 kt headwind
    • Cruise level: FL260
    • ISA deviation: +20°C

    Example 7

    Example 8 — distinguish the three failure cases

    For 800 NM, 25 kt headwind and 55,000 kg, the source gives:

      The chart is specific to the training aircraft and the assumptions. Never substitute these figures into an actual flight release.

      57. Non-normal operations: gear-down ferry flight

      The text uses CAP 697 MRJT1 Figure 4.6.1 for a gear-down ferry-flight case. Its stated basis is all engines operating at 220 KIAS, with climb and descent fuel and time included. This is a special configuration calculation, not a general-purpose abnormal-flight rule.

      Example 9

      Example 10

      Notice that a shorter distance does not necessarily mean lower fuel or time: aircraft mass, wind, altitude, temperature and configuration all affect the result. A dispatcher should identify the exact chart and configuration before extracting a number.

      58. Fuel tankering: calculate the fuel penalty before comparing prices

      Tankering means carrying more fuel than is required for the current sector because the fuel price at the destination or a later station is expected to be higher. The extra fuel adds mass, so part of the uplift is burned simply carrying the additional fuel. The economic question is whether the cost avoided at the destination exceeds the cost of the fuel penalty plus any additional costs.

      Further study

      1. Use the correct LRC or Mach tankering chart.
      2. Read the percentage of surplus fuel that will be consumed as a penalty.
      3. Use the fuel-price differential chart to determine the destination break-even price for the departure price and penalty.
      4. Check mass, performance, fuel capacity, structural limits and whether the tankering changes cruise-altitude capability.

      Example 11

      Example 12

      Net economic benefit = destination purchase cost avoided − departure cost of tankered fuel − fuel-penalty cost − other incremental costs

      The formula is a decision framework, not a substitute for the source graph or the airline's cost model. The graph's break-even price already incorporates its specific assumptions.

      59. Tankering worked decision: a simple transparent illustration

      Consider a purely illustrative uplift of 2,000 kg for a later sector. If the approved tankering chart indicates that 10% of the surplus fuel is burned as a carriage penalty, then:

      Fuel penalty = 2,000 × 0.10 = 200 kg

      Operational constraints that can defeat an economic proposal

      • Take-off or landing mass limit reached.
      • Maximum zero-fuel or structural fuel capacity limit reached.
      • Fuel volume/temperature constraints or tank distribution limits.
      • Climb or cruise altitude capability adversely affected.
      • Additional fuel burn increases emissions and operating cost.
      • Fuel quality, availability, payment or uplift reliability at the later station is uncertain.
      • Weather, route or payload changes make the original tankering assumption invalid.
      Safety comes first: tankering is optional commercial optimisation. It cannot justify exceeding aircraft limitations, reducing required reserves or departing from approved fuel policy.

      60. Computer flight plan: audit the data chain, not just the final fuel total

      A computer flight plan is only as reliable as its input data, aircraft performance model, route database, weather package, NOTAM data and configuration assumptions. The text's warning — “garbage in, garbage out” — is a practical audit principle.

      Input / data groupQuestions to ask
      Aircraft identity and configurationCorrect type, variant, engine, registration, performance factor and MEL/CDL effects?
      Route and airspaceCorrect SID/STAR, airway, waypoint coordinates, restrictions, route validity and ATC constraints?
      WeatherCorrect forecast cycle, wind/temperature levels, significant weather and validity time?
      Mass and payloadAre ZFW, take-off mass, landing mass and payload consistent with load control?
      Fuel policyAre taxi, trip, contingency, alternate, final reserve, additional and extra fuel correctly represented?
      Airport dataAre runway, elevation, declared distances, approach capability and NOTAM status current?
      Cost index / cruise modeDoes the selected mode match the operator's intended policy and schedule?

      For an ETOPS route, add checks for entry/exit points, nominated en-route alternates, diversion times, ETP/CP, critical fuel and the required alternates' forecast/service status.

      61. Detailed OFP reading: fuel summary and route log

      The example computer flight plan includes a summary of point-of-arrival fuel/time/distance, alternate, holding, contingency, required fuel and total fuel. The exact labels vary by provider and operator, so learn the data meaning rather than memorising one software layout.

      -style labelMeaningAudit question
      POAPoint of arrival / destination summaryIs destination fuel, time and distance plausible?
      ALTDestination alternateIs the alternate valid and its diversion fuel correct?
      HLDHolding fuelDoes it match the specified holding time/level and aircraft data?
      CONContingency fuelDoes the amount follow the operator's approved scheme?
      REQRequired fuel total as defined by that OFPWhich components are included or excluded?
      XTRExtra fuelIs the reason recorded and quantity authorised?
      TOTTotal fuel shown by the outputDoes it reconcile to the release/uplift figure?

      On the route log, verify each leg's track, distance, wind, wind component, groundspeed, time, cumulative time, fuel used and fuel remaining. Confirm that top of climb (TOC), top of descent (TOD), FIR crossing times and coordinates are internally consistent.

      Fuel reconciliation example

      If the OFP shows 6,252 kg required fuel and a separate taxi/start allowance of 180 kg, do not assume the required total includes taxi. Confirm the software's definition, then reconcile planned ramp fuel to the actual uplift and fuel-on-board indication. The same numerical total can mean different things in different OFP formats.

      62. Independent cross-check: detect a plausible-looking but wrong plan

      A computer plan can be internally consistent and still be wrong if it used the wrong weather, aircraft variant or route. Cross-check the plan against independent sources and known route behaviour.

      Dispatcher's audit sequence

      1. Confirm the OFP generation time and weather package timestamp.
      2. Confirm aircraft registration, type/variant and performance database version.
      3. Compare planned route and level with the clearance/route availability and NOTAM restrictions.
      4. Check wind direction, speed and average component against the forecast at the relevant levels.
      5. Recalculate at least one representative leg's groundspeed and time.
      6. Compare trip fuel with recent or expected performance for the route and season.
      7. Verify alternate selection, weather window, runway and approach availability.
      8. Check fuel components and ensure no category is omitted or double-counted.
      9. Review mass limits, fuel capacity and planned landing mass.
      10. For ETOPS, separately verify route coverage, alternates, critical fuel and ETP/CP outputs.
      Reasonableness test: a large change in wind, route length, cruise level or aircraft mass should usually produce a visible change in time, fuel or both. If the output barely changes, investigate the inputs.

      63. Integrated case study: alternate becomes unsuitable before ETOPS entry

      Analysis

      1. Do not treat the original dispatch check as permanently valid.
      2. Reassess the alternate against current forecast and service status.
      3. Identify another adequate and suitable aerodrome within the approved diversion time.
      4. Recalculate route coverage and the applicable ETP/critical-fuel data as required.
      5. Coordinate the revised plan with the flight crew and follow the operator's pre-entry review procedure.
      6. If compliant coverage cannot be established, do not proceed into the ETOPS segment under the assumed plan; follow approved company/regulatory procedures.

      64. Integrated case study: computer plan fuel is short at the critical point

      Shortfall = 9,250 − 8,900 = 350 kg

      The dispatcher must not simply add 350 kg without checking the complete fuel and mass consequences. Verify that the two quantities are on the same basis (usable fuel, same point, same scenario and same units), check whether chart corrections and configuration assumptions are included, then apply the operator's approved additional-fuel procedure. Recompute ramp, take-off and landing mass and ensure fuel capacity and performance limits remain satisfied.

      If the additional fuel cannot be carried within limitations, the operation may require a route change, different suitable alternate, payload adjustment, different aircraft or cancellation. The final action must be made under the operator's approved procedures and regulatory approval.

      65. Integrated case study: tankering versus operational flexibility

      At the break-even point, the theoretical saving is zero before any unmodelled costs. If the destination price is exactly 90 cents, there is no economic margin in favour of tankering. If the destination price is lower, tankering is uneconomic under those assumptions. If it is higher, the proposal may have a positive theoretical benefit — but only after checking uplift fees, taxes, currency, extra burn, mass limits, fuel capacity, schedule and the possibility that the route or payload changes.

      This is why a dispatcher should present both the economic result and the operational constraints rather than treating the chart's percentage as a recommendation to uplift.

      66. Chapter 30 practical review checklist

      • Identify the applicable ETOPS/EDTO approval, maximum diversion time and OEI speed.
      • Confirm adequate/suitable en-route alternates and their expected-time weather/service status.
      • Check MEL/CDL effects and required communications/navigation capability.
      • Verify entry/exit coverage and route-specific ETP/CP calculations.
      • Calculate the prescribed critical-fuel scenarios and compare with planned fuel at the correct point.
      • Use the correct chart for OEI-only, pressurisation-only, combined failure or non-normal configuration.
      • For tankering, convert NGM to NAM where required and use the correct chart inputs.
      • Confirm tankering does not adversely affect altitude capability, mass, capacity or performance.
      • Audit OFP timestamps, aircraft identity, route, winds, fuel components and alternates.
      • Record assumptions, source versions, checks and any replanning decisions.
      Final operational principle: an accurate calculation is only one part of a safe dispatch decision. It must be based on current approved data, valid assumptions, current airport information and the operator's approved procedures.

      67. Practical dispatch workflow

      1. Confirm aircraft, engine, configuration, approvals and MEL status. 2. Verify route and en-route alternate suitability. 3. Confirm communications/navigation coverage. 4. Review forecast and NOTAM validity. 5. Check the normal fuel plan. 6. Determine ETP/CP and required critical-fuel scenarios. 7. Compare predicted fuel on board with critical fuel. 8. Review diversion distance and OEI performance. 9. Audit computer-generated OFP and ATC plan. 10. Assess non-normal and tankering considerations. 11. Communicate material assumptions and release only under approved procedures.

      68. Common examination and operational traps

      Do not confuse adequate with suitable; do not confuse threshold distance with approved rule distance; do not assume the ETP is halfway when wind exists; do not confuse the ETP with the most critical fuel point; do not use the all-engine critical-fuel chart for an OEI scenario; do not forget APU/icing/temperature corrections where specified; do not treat the area-of-operation chart as a forecast-wind fuel calculation; do not tankering-calculate without the extra-burn penalty; and never accept a computer plan without independent reasonableness checks.

      69. Summary

      ETOPS/EDTO is an approved operational system combining aircraft capability, operator procedures, maintenance, crew, route, alternates, communications, navigation and fuel. Adequate aerodromes meet basic capability criteria; suitable aerodromes are usable for the particular operation and time. ETP identifies equal diversion time; CP identifies the most demanding fuel point. Critical fuel is compared with planned fuel at the relevant point. Diversion charts must be used with their specified inputs and assumptions. Tankering is an economic trade-off constrained by mass, performance and safety. Computer-generated plans require independent verification.

      70. Knowledge check instructions

      Answer the questions below to test understanding. The quiz is formative and is not an operational approval or substitute for an approved company procedure. Questions distinguish source-based This course concepts from simplified teaching examples.

      Knowledge Check — 70 Questions

      Select one answer for each question, then submit to see your score and explanations.

      1. What is the central purpose of ETOPS/EDTO planning?
      2. In the chapter, threshold distance is based on:
      3. Rule time is best described as:
      4. An adequate aerodrome is primarily assessed for:
      5. A suitable aerodrome is:
      6. Which weather check is important for an en-route alternate?
      7. The area of operation chart in the /CAP 697 method uses:
      8. A route change during an ETOPS sector should trigger:
      9. Which item can be ETOPS-significant under the discussion?
      10. Why can an MEL item acceptable on a non-ETOPS flight be unacceptable for ETOPS?
      11. ETOPS communication provisions require:
      12. Navigation facilities must support:
      13. Which is included in the pre-flight fuel structure?
      14. The turbine final-reserve example is:
      15. In-flight replanning should include:
      16. Critical fuel refers to fuel required:
      17. Which scenario is identified as worst in the description?
      18. In the critical-fuel scenario, the emergency descent target is:
      19. The ETP answers which question?
      20. The critical point answers which question?
      21. With a significant wind, the ETP is generally:
      22. In the chart example, OEI TAS is 400 kt and still-air distance is 690 NM. Approximate still-air time is:
      23. At 85 kt for 104 minutes, the wind-vector distance is approximately:
      24. The ETP chart method back-plots the wind vector and then:
      25. If planned fuel at the CP is less than critical fuel, the dispatcher should:
      26. The CAP 697 critical-fuel graphs include which common assumption?
      27. The OEI critical-fuel graph also includes:
      28. The CAP 697 area-of-operation diversion chart is entered using:
      29. The in-flight OEI LRC diversion chart example uses which condition?
      30. The diversion example at 940 NM, 60,000 kg, FL260, 50 kt headwind and ISA +20 gives fuel of:
      31. The same diversion example gives time of:
      32. A non-normal event can affect:
      33. The nearest airport is not automatically the best diversion because:
      34. Fuel tankering means:
      35. The main economic penalty of tankering is:
      36. A simplified tankering decision compares:
      37. Which must never be compromised for tankering?
      38. Which is a typical computer flight-planning database input?
      39. The phrase “garbage in, garbage out” means:
      40. Which is a basic input identified by the chapter?
      41. In the computer plan sample, POA means:
      42. In the sample fuel summary, HLD refers to:
      43. In the sample fuel summary, CON refers to:
      44. Which route detail may appear in an OFP?
      45. The filed ATC flight plan and operational flight plan:
      46. Which is a required computer-plan accuracy check in the text?
      47. For a new or rarely flown route, the text recommends:
      48. A route forecast changes from 40 kt tailwind to 20 kt headwind. What should be reviewed?
      49. An en-route alternate falls below planning minima. The dispatcher should:
      50. A plan shows 8,900 kg at CP and critical fuel is 9,250 kg. The shortfall is:
      51. A tankering proposal exceeds take-off mass limits. The correct action is to:
      52. Why should ETOPS alternates be checked for NOTAMs?
      53. Which statement about the ETP and CP is correct?
      54. What is the safest way to use CAP 697 examples?
      55. What is the final responsibility when reviewing a computer-generated plan?
      56. What does the ETOPS entry point represent?
      57. Which statement best describes an ETOPS en-route alternate?
      58. Why can an MEL item affect ETOPS dispatch?
      59. In the training critical-fuel example, what is the assumed emergency descent level?
      60. What is the Example 1 critical-fuel answer?
      61. Which point answers the question “where are the times to two alternates equal?”
      62. Does the ETP always equal the fuel-critical point?
      63. What is the Answer for Example 6 OEI LRC diversion?
      64. What is the stated basis for the gear-down ferry chart?
      65. What is the Example 9 gear-down ferry answer?
      66. What three inputs are used to enter the tankering graph?
      67. What surplus-fuel burn percentage does Example 11 give?
      68. A tankering proposal breaches MTOM. What is the correct response?
      69. Which OFP item should be checked against the weather package timestamp?
      70. The computer OFP shows a plausible total fuel but the wrong aircraft variant. What does this demonstrate?

      Your score: —

      Further study

      • UK CAA CAP 697, MRJT1 training charts referenced by the chapter, including Figures 4.7.1a/b, 4.7.2 and 4.7.3. Training use only; verify current approved data.