Aircraft Weighing and Basic Empty Mass
How an aircraft’s actual empty mass and centre-of-gravity position are established, documented, and maintained as its equipment configuration changes.
1. Learning outcomes
By the end of this chapter, you should be able to explain why aircraft are weighed, describe the contents and preparation requirements associated with a weighing, distinguish the principal weighing methods, and interpret the basic calculations used to establish BEM and CG.
- Explain why an aircraft’s mass and CG must be established by measurement rather than assumed from another aircraft of the same type.
- Define Basic Empty Mass (BEM) and identify the standard items included in the cited training definition.
- Explain the purpose of a controlled aircraft configuration and a consistent weighing environment.
- Describe the function and contents of a weighing schedule.
- Compare weigh-bridge scales, hydrostatic weighing units, and electronic strain-gauge systems.
- Calculate total measured mass, total moment, and CG position from support-point readings.
- Explain why equipment changes must be recorded and reflected in mass-and-balance data.
- Distinguish BEM as a foundational mass from the Dry Operating Mass used in many large-aircraft operational calculations.
2. Why are aircraft weighed?
An aircraft’s actual mass and centre of gravity cannot safely be established by simply looking at it, estimating its contents, or copying the figures from another aircraft of the same model. Individual aircraft can differ because of production tolerances, repairs, modifications, installed optional equipment, and configuration changes made during service.
Weighing establishes the aircraft’s actual mass in a defined condition. When the readings are combined with known measurement locations (arms), the total moment and CG position can be calculated. These values form a reliable starting point for later loading calculations.
2.1 The two results that matter
Mass without CG is incomplete for loading purposes. Two aircraft with the same BEM can have different CG positions if their mass is distributed differently. Likewise, a correct CG calculation depends on correct mass, arm, datum, and configuration information.
2.2 Why not use the manufacturer’s published figure?
Published data and approved documentation provide the framework and limits, but the individual aircraft’s actual configuration must be accounted for. An aircraft may have had equipment installed or removed, repairs completed, or modifications embodied. The weighing record captures the aircraft as prepared for that weighing, not an assumed generic example.
2.3 When is weighing performed?
The text describes weighing at specified periods and emphasizes the need for a weighing schedule each time. The exact intervals, triggers, tolerances, preparation details, and approval process are aircraft- and jurisdiction-specific. They must be taken from current approved maintenance and regulatory documentation rather than inferred from an old training reference.
3. Basic Empty Mass (BEM)
BEM is the foundational mass established for the aircraft in its defined basic-empty configuration. The precise definition must always be checked in the applicable aircraft documentation because terminology and included items can vary between aircraft and regulatory frameworks.
3.1 Items included in older training material training definition
The Mass & Balance material identifies the following items as included in BEM:
3.2 BEM is not the same as Dry Operating Mass
| Term | Meaning in the training context | Typical role |
|---|---|---|
| BEM | Basic-empty aircraft mass with the defined standard items included. | Often the starting point for light-aircraft mass and balance calculations. |
| DOM | Aircraft ready for a specific type of operation, excluding usable fuel and traffic load; includes applicable operating items such as crew, crew baggage and service items. | Common operational starting point for larger aircraft. |
| OM | Operating Mass, formed according to the applicable operator/aircraft definition. | Used in operational mass calculations. |
This course makes the distinction that BEM is often used as the starting point for light aircraft, whereas the DOM is the starting point for operational mass-and-balance calculations on larger aircraft. This is a useful conceptual distinction, not a reason to substitute one term for another in a specific aircraft’s approved documentation.
3.3 Why the definition must be exact
If an item is already included in the recorded BEM and is then added again during a loading calculation, the result will be too high. If an item that should be included is omitted, the result will be too low. The same issue applies to moments: the mass must be associated with the correct location.
4. Preparing the aircraft for weighing
A weighing result is only meaningful if the aircraft is prepared in the condition required by the approved weighing procedure. If the configuration changes between weighing events, the results may not be directly comparable.
4.1 Controlled configuration
The previous weighing schedule is used to identify the basic equipment configuration against which the aircraft must be prepared. The text explains that non-basic items, such as passenger service equipment and removable items, may need to be removed before weighing and refitted afterwards. The exact list is aircraft-specific.
Confirm the aircraft identity, applicable weighing instructions, configuration records, and any required technical references.
Use the approved definition and previous schedule to determine which items form part of the basic equipment and which are to be removed or accounted for separately.
Ensure fuel, oil, hydraulic fluid, cooling fluid and other relevant items are treated exactly as the approved procedure requires. Do not assume “full” or “empty” without checking the definition.
The text describes specialized weighing equipment in a draught-free hangar. Other environmental and equipment conditions are determined by the approved procedure.
Use the designated support points, weighing equipment, levelling and aircraft attitude instructions, and record the readings as required.
Calculate total mass, moments and CG; verify the results and complete the required record with the responsible sign-off.
4.2 Preparation checks explained in greater depth
Fuel preparation deserves particular care. The FAA handbook describes procedures that commonly involve draining fuel in accordance with manufacturer instructions and accounting for residual/unusable fuel. However, some aircraft may have specific weighing instructions that differ. Never assume that every aircraft must be weighed with completely empty tanks or with full tanks.
4.3 Aircraft levelling and support-point geometry
Levelling is not a cosmetic step. The aircraft attitude can affect the relationship between the weighing points, datum, and the arms used in the calculation. The applicable instructions identify the levelling points and required attitude. The FAA maintenance guidance discusses levelling the aircraft and using the specified weighing points. This chapter does not provide aircraft-specific levelling angles or jacking instructions.
4.4 Brake and side-load considerations
Where the approved method uses wheel platforms, side loads or binding can affect readings. FAA maintenance guidance discusses releasing brakes in the circumstances specified by the procedure to reduce the possibility of erroneous readings from side loads. Whether and how brakes are released is determined by the aircraft’s approved instructions and safety precautions.
4.5 Why every preparation step matters
| Preparation issue | Possible consequence if incorrect | Control principle |
|---|---|---|
| Residual water or dirt | Unaccounted mass; inconsistent results | Clean and dry as required by approved data. |
| Incorrect fuel condition | Fuel mass may be wrongly included or excluded | Follow aircraft-specific fuel preparation instructions. |
| Uncalibrated or unzeroed scales | Biased or unreliable readings | Verify calibration and zero per equipment instructions. |
| Incorrect levelling/attitude | Incorrect geometry and CG calculation | Use specified levelling points and attitude. |
| Wrong equipment condition | Recorded BEM does not match actual configuration | Reconcile the equipment list and weighing schedule. |
4.2 Why a draught-free enclosed environment?
The material specifies a draught-free hangar. The purpose of a controlled environment is to reduce external influences that could disturb the aircraft or the measurement setup. Air movement, unstable support conditions, poor positioning, unsuitable surfaces, and incorrect equipment setup can undermine measurement quality. The specific environmental tolerances must come from the approved weighing instructions.
4.3 Basic equipment versus removable service items
The example of a weighing schedule lists items such as pilot’s seat, co-pilot’s seat, compass and radio. It also explains that non-basic items such as passenger seats and passenger service equipment (for example food or duty-free trolleys) may need to be removed before weighing and refitted afterwards. The exact classification depends on the approved aircraft definition and weighing schedule.
5. The weighing schedule
A weighing schedule is the formal record compiled for a weighing event. According to This course, it lists the aircraft’s basic equipment, records the mass readings displayed by the weighing apparatus, includes calculated moments, and concludes with the BEM and CG position. It is signed by the person responsible for the weighing procedure and retained in the aircraft’s technical records as described by the source.
5.1 Information commonly shown
- Aircraft type, mark/variant and registration or serial identity.
- Owner/operator details and date of weighing, where required by the form.
- List of basic equipment and its configuration.
- Support-point readings (for example nose wheel and main wheels) and their arms.
- Calculated moments and the resulting total mass and CG.
- Responsible person’s name/signature and any required certification or approval information.
- References to the applicable weighing data and any configuration changes or corrections.
5.2 Simplified training example from
The text gives an illustrative set of support-point values. The example below reproduces the arithmetic in a simplified form so that the relationship between readings, arms, moments and total mass can be understood.
| Support point | Mass (kg) | Arm (in) | Moment (kg·in) |
|---|---|---|---|
| Nose wheel | 134 | −2 | −268 |
| Left main | 550 | 90 | 49,500 |
| Right main | 550 | 90 | 49,500 |
| Total | 1,234 | — | 98,732 |
The result is a CG arm of 80 inches from the datum used in the example. Notice that the nose-wheel arm is negative. Its moment must therefore be negative under the example’s sign convention.
5.3 Reading the schedule as a controlled record
A good schedule lets another qualified person understand what aircraft was weighed, in what configuration, what the instruments indicated, which arms were applied, and how the final BEM and CG were obtained. It should be internally consistent: the support readings must add to the stated total mass, and the individual moments must add to the stated total moment.
5.4 Traceability and record continuity
The schedule is useful beyond the day of weighing. It forms part of the aircraft’s mass-and-balance history and provides the baseline against which later equipment changes and subsequent weighing events can be assessed. The text specifically describes retaining the schedule in the technical log until the next weighing; current record location and retention rules must be verified in the applicable maintenance and operator system.
5.3 Why keep the previous schedule?
The previous schedule provides a baseline for the basic equipment configuration. If an item has been installed, removed or changed since the last weighing, that difference must be identified and dealt with under the approved procedure. The schedule therefore supports traceability and helps prevent an old mass-and-balance record from being treated as though the aircraft had never changed.
6. Aircraft weighing equipment
This course identifies three principal methods, selected according to aircraft size and mass: weigh-bridge scales, hydrostatic units, and electronic equipment using strain gauges.
6.1 Weigh-bridge scales
These are generally used for light aeroplanes. A separate electronic weighing platform is placed beneath the nose or tail wheel and each main-wheel assembly. The mass shown at each platform is recorded. The readings are then added to obtain the aircraft’s total mass.
6.2 Hydrostatic units
This course describes hydrostatic units as a method used for larger, heavier aircraft. A unit is fitted at each jacking point, between the lifting jack and the aircraft’s jacking point. The method uses the principle associated with Pascal’s Law: pressure in a confined liquid is related to the applied load. The readings from the units are combined to establish the aircraft’s mass.
6.3 Electronic strain-gauge equipment
This course also describes electronic equipment fitted at the jacking points. Strain gauges respond to deformation under load, and their electrical resistance changes with the applied load. The equipment converts the measured response into readings that can be combined to establish the total mass.
6.4 What the technician is actually measuring
In a wheel-platform arrangement, each platform measures the load transmitted through its support point. Those readings are not interchangeable: the nose-wheel load and main-wheel loads act at different arms. The aircraft total is obtained by adding the support readings, while the CG is found by adding their moments and dividing by total mass.
6.5 Load cells and digital indication
Modern weighing systems may use electronic load cells and digital indicators. A load cell converts an applied force into an electrical signal that the instrument processes and displays. The exact sensor technology and calibration method depend on the equipment. This is a supplementary modern explanation; it should not be confused with the narrower description of strain gauges at jacking points.
6.6 Equipment selection and suitability
The weighing equipment must be suitable for the aircraft and the intended measurement arrangement. Capacity, resolution, calibration, physical fit, load distribution, support-point geometry and the approved procedure all matter. A scale with a suitable maximum capacity is not automatically suitable for every aircraft or every weighing configuration.
6.4 Comparison of the three methods
| Method | Where This course says it is used | Principle | What is combined? |
|---|---|---|---|
| Weigh-bridge scales | Generally light aeroplanes | Separate platforms measure wheel/support loads. | Platform readings. |
| Hydrostatic units | Larger, heavier aircraft | Pressure in a confined liquid relates to applied load. | Readings from units at jacking points. |
| Electronic strain gauges | Larger, heavier aircraft | Electrical resistance changes with applied load/strain. | Readings from gauges at jacking points. |
7. Calculating BEM and CG from weighing readings
The calculation links each measured load to its position relative to the datum. A reading gives a mass (or load converted to mass units by the equipment); the arm gives the distance from datum; their product is the moment.
7.1 Sign convention
The datum and sign convention must be the same for every support point. If a point is forward of the datum, its arm may be negative under the chosen convention; if aft, it may be positive. Some aircraft documentation uses a different convention. Never assume the sign: read the stated datum and convention.
7.2 Worked calculation using the schedule
Nose wheel: 134 kg at −2 in; left main: 550 kg at 90 in; right main: 550 kg at 90 in.
Step 1 — Mass
134 + 550 + 550 = 1,234 kg.
Step 2 — Moments
(134 × −2) + (550 × 90) + (550 × 90) = −268 + 49,500 + 49,500 = 98,732 kg·in.
Step 3 — CG
98,732 ÷ 1,234 = 80.0 in aft of the datum, under the example’s sign convention.
7.3 Why arms and datum matter
A mass reading alone cannot locate the CG. If the same mass is measured at different positions, its moment changes. If the datum is changed, every arm changes; moments also change, but the physical CG location does not. The calculated CG must always be reported relative to the stated datum.
7.4 A practical calculation check
- Confirm all readings use the same mass unit.
- Confirm every arm is measured from the same datum.
- Apply the correct sign to every arm and moment.
- Check that total mass is the sum of all support readings.
- Check that total moment is the algebraic sum of the individual moments.
- Divide total moment by total mass only after both totals are established.
- Compare the result with approved aircraft data; a classroom calculation is not an authorization to release an aircraft.
8. Equipment changes and mass-and-balance records
Aircraft equipment does not necessarily remain identical throughout its service life. Equipment can be added, removed, replaced by a different model, or relocated. Even if the change in mass is relatively small, its location can make its moment effect significant.
8.1 Why the technical record matters
This course states that changes to basic equipment between weighings are recorded in the aircraft technical log and must be accounted for separately at the next weighing when they differ from the previous schedule. This makes the equipment list a traceable record rather than a casual checklist.
8.2 Mass change versus moment change
A 12 kg item is installed at an arm of 4.0 m from the datum.
Moment added = 12 × 4.0 = 48 kg·m.
If the item is instead installed at 8.0 m, the moment added is 96 kg·m. The mass is unchanged, but the moment effect doubles.
8.3 Installed, removed, or relocated
9. How BEM is used in operations
Once the aircraft’s BEM and CG have been established, later mass-and-balance calculations can build on that baseline. The exact operational process depends on aircraft type and operator procedures.
9.1 Light aircraft
This course explains that light aircraft commonly use BEM and its associated CG position as the foundation from which other mass and CG requirements are determined. Loading items, occupants, baggage and fuel are then accounted for using the aircraft’s approved loading data.
9.2 Larger aircraft
For larger aircraft, This course explains that the DOM is generally the starting point for operational mass-and-balance calculations. A load and trim sheet may be used to standardize and simplify the loading process. The BEM still matters as a foundational aircraft mass, but it is not necessarily the operational starting figure used on each flight.
9.3 Fleet averages
This course notes that an operator may use an average DOM and CG position for a fleet of aircraft of the same model and configuration, subject to the requirements of the cited EU-OPS framework. This should be understood as a historical training statement, not as blanket permission under current Rwanda requirements. Any fleet-average method must be explicitly permitted by the applicable current regulations and approved operator procedures.
9.4 MEL and equipment status
This course introduces the Minimum Equipment List (MEL) in the context of aircraft equipment and operational status. The MEL identifies equipment that may be inoperative under specified conditions. For mass-and-balance purposes, the aircraft’s actual equipment configuration still has to be treated correctly. An MEL dispatch allowance does not automatically mean the mass-and-balance record can be ignored or left unchanged; the approved procedures determine how the item is accounted for.
10. Worked examples and practice calculations
The examples below are original teaching exercises. They reinforce the principles in the course material and are not aircraft-specific maintenance instructions.
Three support readings are 160 kg, 620 kg and 610 kg.
Total = 160 + 620 + 610 = 1,390 kg.
A support reading is 175 kg at an arm of 2.4 m.
Moment = 175 × 2.4 = 420 kg·m.
A 145 kg reading acts at −1.5 m.
Moment = 145 × −1.5 = −217.5 kg·m.
Moments are −300, 42,000 and 42,000 kg·in.
Total = −300 + 42,000 + 42,000 = 83,700 kg·in.
Total mass is 1,200 kg and total moment is 90,000 kg·in.
CG = 90,000 ÷ 1,200 = 75 in.
Total mass is 1,500 kg. Two readings are 180 kg and 640 kg.
Third reading = 1,500 − 180 − 640 = 680 kg.
A 200 kg reading produces a moment of 1,000 kg·m.
Arm = 1,000 ÷ 200 = 5 m.
A 15 kg unit is installed at 3 m.
Added moment = 15 × 3 = 45 kg·m.
A 9 kg item at 6 m is removed.
Change in moment = −(9 × 6) = −54 kg·m.
A 20 kg item moves from 2 m to 7 m.
Old moment = 40 kg·m; new moment = 140 kg·m; change = +100 kg·m.
Original mass 1,250 kg; add 18 kg.
New mass = 1,268 kg.
Original moment 82,000 kg·m; an item adds 120 kg·m.
New moment = 82,120 kg·m.
Original mass 1,000 kg and moment 70,000 kg·m. Add 20 kg at 5 m.
New mass = 1,020 kg; new moment = 70,100 kg·m; CG = 70,100 ÷ 1,020 = 68.73 m.
Original mass 900 kg and moment 54,000 kg·m. Remove 10 kg at 4 m.
New mass = 890 kg; new moment = 53,960 kg·m; CG = 60.63 m.
A 10 kg item at 2 m contributes 20 kg·m. At 9 m it contributes 90 kg·m. Difference = 70 kg·m.
Readings 134, 550 and 550 kg total 1,234 kg. If a schedule states 1,244 kg, the figures do not reconcile; investigate the source readings and arithmetic before accepting the result.
Moments are −250, +36,000 and +36,000 kg·in. Correct total = 71,750 kg·in, not 72,250.
Using the example: total mass 1,234 kg; total moment 98,732 kg·in. CG = 80 in.
Moment 360 kg·m at arm 4.5 m.
Mass = 360 ÷ 4.5 = 80 kg.
A 14 kg replacement component is installed at the same arm as the 11 kg component it replaces, 6 m.
Difference in mass = 3 kg; moment difference = 3 × 6 = 18 kg·m.
A 30 kg item moves from 1.5 m to 4.0 m. Moment change = 30 × (4.0 − 1.5) = 75 kg·m.
Masses: 100 kg at 1 m, 200 kg at 3 m, 300 kg at 5 m. Total mass = 600 kg; total moment = 100 + 600 + 1,500 = 2,200 kg·m; CG = 3.67 m.
Masses: 100 kg at −1 m, 400 kg at 4 m, 400 kg at 4 m. Total mass = 900 kg; moment = −100 + 1,600 + 1,600 = 3,100 kg·m; CG = 3.44 m.
It records the defined configuration and readings, then establishes BEM and CG. It is not simply a list of passenger and baggage loads.
A light-aircraft exercise provides BEM and CG; a large-aircraft operational exercise provides DOM and trim data. Use the starting point specified by the applicable aircraft/operator method, not whichever term is more familiar.
Readings: 120 kg at −1.0 m, 480 kg at 4.0 m and 500 kg at 4.0 m. Total mass = 1,100 kg. Total moment = −120 + 1,920 + 2,000 = 3,800 kg·m. CG = 3,800 ÷ 1,100 = 3.455 m from the stated datum.
Readings: 100 kg at −2 m, 400 kg at 3 m and 400 kg at 3 m. Correct total moment = −200 + 1,200 + 1,200 = 2,200 kg·m. If a student writes 2,600 kg·m, the negative nose-point moment has likely been treated as positive.
Remove a 10 kg unit at 2 m and install a 13 kg unit at 3 m. Mass change = +3 kg. Moment change = (13 × 3) − (10 × 2) = 39 − 20 = +19 kg·m.
A 25 kg equipment box is moved from 2.5 m to 6.5 m. The mass change is zero. Moment change = 25 × (6.5 − 2.5) = +100 kg·m.
Recorded readings are 145 kg, 525 kg and 530 kg. The schedule states total mass 1,190 kg. Check: 145 + 525 + 530 = 1,200 kg. The schedule is inconsistent by 10 kg and should be investigated.
Total moment is 75,000 kg·in. Two recorded moments are −250 and +38,000 kg·in. Missing moment = 75,000 − (−250 + 38,000) = 37,250 kg·in.
A 4 kg antenna is installed at 12 m. Its moment is 48 kg·m. A 4 kg item at 2 m contributes only 8 kg·m. Equal masses can have very different balance effects.
Initial mass 1,000 kg and moment 60,000 kg·m. Install 10 kg at 2 m and 15 kg at 5 m. New mass = 1,025 kg; new moment = 60,000 + 20 + 75 = 60,095 kg·m. CG = 58.63 m.
Initial mass 800 kg and moment 44,000 kg·m. Install 12 kg at 4 m and remove 5 kg at 2 m. New mass = 807 kg; new moment = 44,000 + 48 − 10 = 44,038 kg·m. CG = 54.57 m.
An aircraft has its standard fixed equipment, unusable fuel, specified fluids and required standard safety equipment installed. It is weighed in the approved condition. That defined configuration, rather than an aircraft stripped of all equipment, is the basis of the BEM result.
11. Common errors and examination traps
12. Chapter summary
- Aircraft weighing establishes the aircraft’s actual mass and CG in a defined configuration.
- BEM is a defined basic-empty condition, not an aircraft stripped of every item.
- The definition includes unusable fuel and fluids, engine/auxiliary lubricating oil, fire extinguishers, pyrotechnics, emergency oxygen and standard supplementary electronic equipment.
- The aircraft must be prepared in accordance with the approved weighing procedure; the previous schedule helps establish the required basic-equipment condition.
- The weighing schedule records equipment configuration, support readings, arms, moments, BEM and CG, with the required sign-off and record retention.
- This course describes weigh-bridge scales, hydrostatic units and electronic strain-gauge equipment.
- Moment equals mass multiplied by arm; CG arm equals total moment divided by total mass.
- Changes to basic equipment must be traceable and processed through the approved mass-and-balance system.
- BEM is commonly a starting point for light-aircraft calculations; DOM is commonly used as the operational starting point for larger aircraft.
13. Knowledge check — 40 questions
Further study
- UK CAA CAP 697 and CAP 698 — public training data sheets for flight planning and performance (caa.co.uk).
Primary course reference
The source describes the weighing schedule, basic-equipment condition, record retention, the three weighing-equipment methods, and the distinction between BEM and DOM.
Supplementary educational references
External image availability and reuse permissions are controlled by their respective hosts. Before publishing this chapter publicly, verify image ownership, licensing, attribution requirements, and whether hotlinking is permitted. Replace any image that does not load with an appropriately licensed asset.